A short length 132kV cable connection was required within RAF Lyneham Substation.
Mendeco produced thermal-mechanical and short-circuit force calculations for the 132kV AIS terminations and CSE support structures.
Liaising with the Client's Civil Engineering team to ensure the correct forces were being used to develop the new structures.